N2 - Simulation modeling is important in predicting the productivity of construction operations and the performance of project schedules. It would be desirable if operation and project models are vertically integrated in practice. However, existing discrete event simulation systems do not allow integrating operation and project models. This paper introduces an integrated simulation system named "Construction Operation and Project Scheduling" (COPS). COPS analyzes the productivity of construction operations as well as the performance of a project schedule individually and jointly. It creates operation models, maintains these models in its operation model library, conducts sensitivity analysis with different resource combinations, finds the optimal resource combination that satisfies the user's requirements relative to hourly production and hourly cost of the operation, feeds this information into a project schedule, and executes stochastic simulation-based scheduling. A case study is presented to demonstrate this integrated simulation system.
AB - Simulation modeling is important in predicting the productivity of construction operations and the performance of project schedules. It would be desirable if operation and project models are vertically integrated in practice. However, existing discrete event simulation systems do not allow integrating operation and project models. This paper introduces an integrated simulation system named "Construction Operation and Project Scheduling" (COPS). COPS analyzes the productivity of construction operations as well as the performance of a project schedule individually and jointly. It creates operation models, maintains these models in its operation model library, conducts sensitivity analysis with different resource combinations, finds the optimal resource combination that satisfies the user's requirements relative to hourly production and hourly cost of the operation, feeds this information into a project schedule, and executes stochastic simulation-based scheduling. A case study is presented to demonstrate this integrated simulation system.
KW - Construction operation model
KW - Discrete event simulation
KW - Schedule model
KW - Simulation based scheduling
UR - http://www.scopus.com/inward/record.url?scp=77958149841&partnerID=8YFLogxK
U2 - 10.1061/(ASCE)CP.1943-5487.0000061
DO - 10.1061/(ASCE)CP.1943-5487.0000061
M3 - Article
AN - SCOPUS:77958149841
SN - 0887-3801
VL - 24
SP - 557
EP - 569
JO - Journal of Computing in Civil Engineering
JF - Journal of Computing in Civil Engineering
IS - 6
ER -