Integrating schedule risk analysis with multi‐skilled resource scheduling to improve resource‐constrained project scheduling problems

Muritala Adebayo Isah, Byung Soo Kim

Research output: Contribution to journalArticlepeer-review

22 Scopus citations

Abstract

Construction projects are planned in a complex and dynamic environment characterized by high risks and uncertainties amidst resource constraints. Assessing construction schedule risk facilitates informed decision‐making, especially in a resource‐constrained situation, and allows pro-active actions to be taken so that project objectives are not jeopardized. This study presents a stochastic multiskilled resource scheduling (SMSRS) model for resource‐constrained project scheduling problems (RCSPSP) considering the impact of risk and uncertainty on activity durations. The SMSRS model was developed by integrating a schedule risk analysis (SRA) model (developed in MS Excel) with an existing multiskilled resource scheduling (MSRS) algorithm for the development of a feasible and realistic schedule. The computational experiment carried out on three case projects using the proposed SMSRS model revealed an average percentage deviation of 10.50%, indicating the inherent risk and uncertainty in activity durations of the project schedule. The core contribution of the proposed SMSRS model is that it: (1) presents project practitioners with a simple tool for assessing the risks and uncertainty associated with resource‐constrained project schedules so that necessary response actions can be taken to ensure project success; (2) provides the small‐scale construction businesses with an affordable tool for evaluating schedule risk and developing a feasible and realistic project schedule.

Original languageEnglish
Article number650
Pages (from-to)1-16
Number of pages16
JournalApplied Sciences (Switzerland)
Volume11
Issue number2
DOIs
StatePublished - 2 Jan 2021

Keywords

  • Construction projects
  • Multiskilled resource scheduling
  • Resource‐con-strained project scheduling problems
  • Risk
  • Schedule risk analysis
  • Uncertainty