TY - GEN
T1 - Optimisation of operational reliability of large-scale industrial wind turbines
AU - Camacho Questa, J. E.
AU - Requena Montejano, V.
AU - Polo, F.
AU - Moreno, L.
AU - Vanhnonacker, T.
AU - Stalaart, B.
AU - Karyotakis, A.
AU - Panagoiliopoulos, O.
AU - Karakassidis, V.
AU - Lang, Z. Q.
AU - Roldán De La Cuadra, C.
AU - Murillo Calleja, M.
AU - Oses, I. E.
AU - Auer, G.
AU - Zalacain, I.
AU - Errea Mugica, J.
AU - Garcia Marquez, F. P.
AU - Pedegral, D.
AU - Lee, D.
AU - Hillmansen, S.
AU - Tricoli, P.
AU - Hajiabady, S.
AU - Fernando, G.
AU - Papaelias, Mayorkinos
N1 - Publisher Copyright:
© 2015 Taylor & Francis Group, London.
PY - 2015
Y1 - 2015
N2 - Condition monitoring (CM) and fault detection of the drive-train and power electronics are two very important tasks which are necessary in order to maintain the reliability of industrial wind turbines. Unexpected failures, expensive repair and downtime costs can be avoided or limited through effective remote CM technology. The consortium of the FP7 OPTIMUS project is involved in the development and demonstration of an integrated CM system based on a modular design, which enables reliable diagnosis and prognosis of the power electronic faults and drive-trains. CM systems have been installed onACCIONAAW-1500 wind turbines to continuously evaluate the condition of power electronics and drive-trains. Some of the key results and analysis methodologies employed are presented in this paper for the power converters.
AB - Condition monitoring (CM) and fault detection of the drive-train and power electronics are two very important tasks which are necessary in order to maintain the reliability of industrial wind turbines. Unexpected failures, expensive repair and downtime costs can be avoided or limited through effective remote CM technology. The consortium of the FP7 OPTIMUS project is involved in the development and demonstration of an integrated CM system based on a modular design, which enables reliable diagnosis and prognosis of the power electronic faults and drive-trains. CM systems have been installed onACCIONAAW-1500 wind turbines to continuously evaluate the condition of power electronics and drive-trains. Some of the key results and analysis methodologies employed are presented in this paper for the power converters.
UR - http://www.scopus.com/inward/record.url?scp=84949818644&partnerID=8YFLogxK
U2 - 10.1201/b18973-131
DO - 10.1201/b18973-131
M3 - Conference contribution
AN - SCOPUS:84949818644
SN - 9781138028715
T3 - Renewable Energies Offshore - 1st International Conference on Renewable Energies Offshore, RENEW 2014
SP - 931
EP - 935
BT - Renewable Energies Offshore - 1st International Conference on Renewable Energies Offshore, RENEW 2014
A2 - Soares, C. Guedes
PB - CRC Press/Balkema
T2 - 1st International Conference on Renewable Energies Offshore, RENEW 2014
Y2 - 24 November 2014 through 26 November 2014
ER -