T1 - Quantitative Evaluation Method and Process of BIM Data for Generating BIM-Based 2D Deliverables
AU - Kim, Yije
AU - Chin, Sangyoon
AU - Choo, Seungyeon
N1 - Publisher Copyright:
© 2023 by the authors.
PY - 2023/12
Y1 - 2023/12
N2 - Views, drawings, and data extracted from building information modeling (BIM) constitute essential deliverables throughout the lifecycle of an architecture, engineering, and construction project, offering crucial insights for comprehending the design. Nevertheless, many employers evaluating BIM deliverables lack standardized criteria for the specific intended use of each BIM outcome, which hampers the practical utility of BIM results. This study introduces a quantitative evaluation method for the management of BIM-based two-dimensional (2D) deliverables. The BIM outcome measurement index for 2D deliverables (BOMI-2D) is formulated to provide a quantitative assessment of BIM data, focusing on their composition, structure, data readiness, and consistency. Pilot tests validated the efficacy of BOMI-2D, revealing an impressive 88.3% reduction in additional work required for 2D deliverables when data readiness increased by 25% and consistency improved by 32%. BOMI-2D is poised to play a pivotal role as an evaluation index for BIM data and outcomes, ultimately enhancing their utilization and productivity.
AB - Views, drawings, and data extracted from building information modeling (BIM) constitute essential deliverables throughout the lifecycle of an architecture, engineering, and construction project, offering crucial insights for comprehending the design. Nevertheless, many employers evaluating BIM deliverables lack standardized criteria for the specific intended use of each BIM outcome, which hampers the practical utility of BIM results. This study introduces a quantitative evaluation method for the management of BIM-based two-dimensional (2D) deliverables. The BIM outcome measurement index for 2D deliverables (BOMI-2D) is formulated to provide a quantitative assessment of BIM data, focusing on their composition, structure, data readiness, and consistency. Pilot tests validated the efficacy of BOMI-2D, revealing an impressive 88.3% reduction in additional work required for 2D deliverables when data readiness increased by 25% and consistency improved by 32%. BOMI-2D is poised to play a pivotal role as an evaluation index for BIM data and outcomes, ultimately enhancing their utilization and productivity.
KW - 2D deliverables
KW - BIM outcome measurement
KW - BIM-based drawings
KW - building information modeling (BIM)
KW - consistency
KW - evaluation index
KW - readiness
UR - http://www.scopus.com/inward/record.url?scp=85180670533&partnerID=8YFLogxK
U2 - 10.3390/buildings13123124
DO - 10.3390/buildings13123124
M3 - Article
AN - SCOPUS:85180670533
SN - 2075-5309
VL - 13
JO - Buildings
JF - Buildings
IS - 12
M1 - 3124
ER -