RULE-BASED DELAY ANALYSIS SELECTION SYSTEM

Juneseok Yang, David Arditi, Dong Eun Lee

Research output: Contribution to journalConference articlepeer-review

Abstract

Since the selection of a delay analysis method depends on the delay analyst's subjective judgment, there is a risk of making problematic decisions due to the delay analyst's ignorance, lack of experience, carelessness, or intention. Each one of these methods may yield different analysis results. Therefore, it is necessary to develop an objective decision-making system based solely on the project environment. The existing delay analysis methods are classified into four types, according to the basic principles used in the analysis. Seven conditions that affect the selection of a delay analysis method (i.e., type of schedule, type of information, timing of analysis, expectations from the delay analysis, acceptance by courts of law, capabilities of delay analysis team, and budget constraint) were identified in a literature review. A delay analysis selection system (DASS) was developed using if-then rules constructed by considering which conditions should exist in a given project environment for successfully performing a specific type of delay analysis and getting realistic results. This system was computerized and validated by implementing it in several but different scenarios considered in this study. The contributions of this study include (1) an objective selection decision can be made based on only the project environment, without relying on the analyst's subjective preference, and (2) unnecessary and expensive legal disputes caused by delay-related issues between construction owners and construction companies can be minimized.

Original languageEnglish
Pages (from-to)CPM-04-1-CPM-04-6
JournalProceedings of International Structural Engineering and Construction
Volume10
Issue number1
DOIs
StatePublished - 2023
Event12th International Structural Engineering and Construction Conference, ISEC-12 2023 - Chicago, United States
Duration: 14 Aug 202318 Aug 2023

Keywords

  • Delay claim litigation
  • Delay claims
  • disputes. Decision support system
  • Legal

Fingerprint

Dive into the research topics of 'RULE-BASED DELAY ANALYSIS SELECTION SYSTEM'. Together they form a unique fingerprint.

Cite this