Abstract
Due to the global environmental issue to reduce carbon dioxide emission, combined heat and power (CHP) plants have widely been installed adjacent to load pockets. This kind of C'HP plant typically consists of a gas and a steam turbine. Because of inherent complicated structures for the combined power plant, the application of power system stabilizers (PSSs) is not easy. Because it is important to set the parameters of PSSs installed in both sides without any negative impact. Careful consideration of possible interaction with the stabilizers installed in Gas Turbine Generator (GTG) and Steam Turbine Generator (STG) should be needed. In the paper, the whole procedure of PSSs tuning for the newly constructed CHP plant(569MVA) is proposed starting from data setup for tuning the parameters based on raw data provided by manufacturers to field test for performance verification of tuned PSSs.
Original language | English |
---|---|
Pages (from-to) | 1604-1615 |
Number of pages | 12 |
Journal | Transactions of the Korean Institute of Electrical Engineers |
Volume | 69 |
Issue number | 11 |
DOIs | |
State | Published - Nov 2020 |
Keywords
- Combined heat and power(chp)
- Parameter tuning
- Power system stabilizer(pss)