The probability distribution of project completion times in simulation-based scheduling

Dong Eun Lee, David Arditi, Chang Baek Son

Research output: Contribution to journalArticlepeer-review

14 Scopus citations

Abstract

The assumption of the normality of the distribution of Project Completion Times (PCTs) in simulation-based scheduling has been generally accepted as the norm. However, it is well established in the literature that PCTs are not always normally distributed and that their distribution and variability are affected by the distribution and variability of activity durations. This paper presents an automated risk quantification method that determines the best fit Probability Distribution Function (PDF) of PCTs. The algorithm is programmed in MATLAB and generates a set of simulation outputs obtained by systematically changing the probability distribution functions that define activities' durations in a network and analyzes the effect of different distributions of activity durations on the distribution of the PCTs. The procedure is described and the findings are presented. This easy-to-use computerized tool improves the reliability of simulation-based scheduling by calculating the exact PDFs of activity durations, simulating the network, and calculating the exact PDF of PCTs. It also simplifies the tedious process involved in finding the PDFs of the many activity durations, and is a welcome replacement for the normality assumptions used by most simulation-based scheduling researchers.

Original languageEnglish
Pages (from-to)638-645
Number of pages8
JournalKSCE Journal of Civil Engineering
Volume17
Issue number4
DOIs
StatePublished - May 2013

Keywords

  • project risk analysis
  • simulation-based scheduling
  • stochastic networks